We bought our house almost 50 weeks ago and started demolition about 11 months ago. New concrete has been poured, walls have been built, a new subfloor installed, and a hole was cut for the stairs. But this past weekend, we made the most significant change to the house so far. If you recall, our house has a pitched roof – that is, it’s not flat. It comes to a point at the top. In order to maintain this shape there are horizontal pieces of wood running from one side of the house to the other. These pieces of wood are, essentially, pulling the exterior walls of the house together and preventing the whole house from going splat.

new roof framing

original wooden beams

The goal this weekend was to replace 4 of the wooden beams with steel rods, with the eventual plan of cutting down the rest of wood and having those 4 rods do the work of 12 or so wooden beams. Crazy stuff, if you ask me.  It was a looooong weekend, and we will be forever in debt to the friends who helped us.  

These are the steel pieces. There are 8 steel rods – 2 for each wooden beam. They meet in the middle and are fastened together by a turnbuckle. Ryan had to thread all the steel rods by hand. On the left side of the picture is one of the steel saddles. This is what anchors the steel rod to the house. Confused? So was I. 

rods and saddles

rods and saddles

 The first step was installing the saddles. Easier said than done. In order to install each saddle, we first had to cut off the 25 foot long redwood beam, install a piece of blocking (sorta like a piece of filler wood), chip out a section of the roof framing so the saddle would be flush, pound the saddle in, drill holes for the bolts, and bolt them in. Sound like a lot of work? There were 8 of the them. 

Ryan, cutting down the existing beam

Ryan, cutting down the existing beam

beam is down, and blocking is in

beam is down, and blocking is in

John, chipping away the extra wood

John, chipping away the extra wood

 

saddle is in!

saddle is in!

 After each set of saddles were installed, we measured the distance between them to determine exactly how long the steel rods needed to be. Then someone had to cut the steel rod to size, which was like watching a fireworks show. 

IMG_3933

measuring

 Once the rods were the proper length, we could finally install them…this part took at least 3 guys: one on each end and one in the middle.

IMG_3943

Screwing the rod to the saddle

The last step was to adjust the middle. Ryan devised a clever way of being able to tighten both rods at the same time using the turnbuckle. I don’t know that I have the words to adequately describe how it works, so I’ll try to get Ryan to describe it later on. I thought it was brilliant.

IMG_3952

Tightening the turnbuckle

One rod finished!

One rod finished!

So with six people, we were able to get 3 of the 4 rods finished in one loooong day.

IMG_3959

 

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s


Follow

Get every new post delivered to your Inbox.